FAQ

How far should fence posts be spaced?

Direct answer

Pipe fence posts run 8 to 10 feet apart. Wire fence t-posts run 8 to 12 feet with braced, concreted corner assemblies doing the real work. Privacy fence posts run 6 to 8 feet to carry wind load. Gate and corner posts go deeper and heavier than the line, always.

More detail

Spacing rules follow what the fence resists. Welded pipe fence carries loads through its rails, so posts at 8 to 10 feet keep rail spans stiff enough that a leaning animal meets steel, not spring; closer spacing at gates and working pens where pressure concentrates is normal. Wire fence works by tension, so its line posts (t-posts at 8 to 12 feet) mostly hold wire height and spacing, while the corner and end assemblies (braced H-frames, set in concrete) anchor the tension of the whole run; that is why wire fence quality is judged at its corners, and why a fence with 12-foot spacing and proper braces outlasts one with 8-foot spacing and lazy corners. Privacy fence is a sail: a 6-foot cedar panel takes real wind load, so posts run 6 to 8 feet apart, set deep, and the north-wind side of an exposed lot argues for the tighter number and steel posts over wood. Depth rules are as important as spacing: the working rule is a third of the post's height in the ground (a 6-foot privacy fence on 2-plus feet of buried post), gate and corner posts deeper and bigger because they carry cantilever and tension loads the line never sees, and concrete around anything that carries a gate. One local wrinkle: on the Blackland side, expansive clay works shallow posts loose over wet-dry cycles, which is one more argument for depth and concrete at every structural post. And before any auger turns: 811 utility locates, every time.

Authoritative sources

  • TxDOT Access Management Manual

    Driveway approaches onto Texas state highways require a TxDOT access permit and must meet the manual's geometry, width, and drainage standards.

  • City of Sherman Development Services

    Building permits, contractor registration, and civil submittals in Sherman run through the city's Self Service Portal.

  • USDA Web Soil Survey

    County-level soil mapping for Grayson, Cooke, Fannin, Collin, Denton, Bryan, and Marshall counties, the starting point for pad and foundation planning.

Ready to get started in Sherman?

Concrete driveways and slabs, site preparation, metal buildings, welding, and fencing across the US 75 corridor from McKinney to Durant since 2016, built by insured local contractors. Mon-Sat 8am-7pm CT.

Call (903) 308-5497

Prefer to text? Open your texting app