How long does a remodel actually take?

Direct answer

A bathroom typically runs three to six weeks, a kitchen six to twelve, and an addition four to eight months from permit to completion. Most overruns come from selections made late and from inspection scheduling, not from labor.

More detail

Realistic durations for this market, assuming permits are in hand and selections are made. A bathroom, three to six weeks. A kitchen, six to twelve weeks, driven almost entirely by cabinet lead time. A whole-house interior renovation, three to six months. An addition, four to eight months from permit issuance, with design and permitting adding one to three months before that. What actually causes overruns, in order. Selections made late, which is the single biggest one: cabinets, tile, plumbing fixtures, and windows all have lead times, and a decision deferred by two weeks in planning can cost six weeks in the schedule. Inspection scheduling, since a jurisdiction with a multi-day backlog inserts that delay at every stage. Hidden conditions found at demolition, particularly in older housing where wiring, plumbing, or framing turns out to be different from what was assumed. Change orders, each of which stops work while it is priced and approved. And weather on any project with exterior work, which in the US 75 corridor from McKinney to Durant means both the wet spring and the summer heat that limits what crews can do on a roof by early afternoon. How to protect the schedule. Make every selection before demolition, including the ones that feel far off. Ask the contractor for the lead-time list at contract signing and order the long-lead items first. Agree on a decision deadline for anything not yet chosen. And ask what the inspection turnaround currently is in your jurisdiction, since that varies and it is knowable. What a schedule in the contract is worth. A stated start date, a stated substantial completion date, and a defined process for extending it are all reasonable to ask for. Liquidated damages are unusual in residential work and generally not worth fighting for; a written schedule with milestone-tied payments accomplishes most of the same thing.

Authoritative sources

  • TxDOT Access Management Manual

    Driveway approaches onto Texas state highways require a TxDOT access permit and must meet the manual's geometry, width, and drainage standards.

  • City of Sherman Development Services

    Building permits, contractor registration, and civil submittals in Sherman run through the city's Self Service Portal.

  • USDA Web Soil Survey

    County-level soil mapping for Grayson, Cooke, Fannin, Collin, Denton, Bryan, and Marshall counties, the starting point for pad and foundation planning.

Ready to get started in Sherman?

Concrete driveways and slabs, site preparation, metal buildings, welding, and fencing across the US 75 corridor from McKinney to Durant since 2016, built by insured local contractors. Mon-Sat 8am-7pm CT.

Call (903) 308-5497

Prefer to text? Open your texting app