comparison · 4 min read

Farm and ranch fencing in Grayson and Fannin counties

By Wade Sutton, North Texas construction specialist: the Blackland Prairie clays and Cross Timbers sands that decide how concrete and site work perform here, the TxDOT and city permitting rules on both sides of the Red River, and what belongs in a written project scope. Published October 9, 2026.

Barbed, woven, or pipe? How Texas stock law, Blackland clay, and the braces at every corner shape a farm fence from Bonham to Whitesboro.

Questions about general construction? Call or text us.

Call (903) 308-5497

You just closed on acreage outside Bonham, Tom Bean, or Whitesboro, and the old fence is a row of leaning cedar posts holding up rusted wire. Before you price a new one, three things decide what the fence should be: who is legally responsible for keeping animals where, what the ground does to posts, and which animals the fence has to hold.

Who has to fence what

Texas handles livestock at large through local option. Chapter 143 of the Agriculture Code lets the freeholders of a county, or an area within one, petition for an election on whether horses, hogs, sheep, and goats may run at large, and a separate election covers cattle under a stock law. Whether your county or precinct has adopted one is a local question worth putting to the county clerk.

One rule applies statewide regardless of local elections. Section 143.102 says a person who owns or controls a horse, mule, donkey, cow, bull, steer, hog, sheep, or goat may not knowingly let the animal roam at large, unattended, on a highway right-of-way. Road frontage is where a weak fence becomes a liability, which is why most owners spend the most per foot on the front line and less down the sides.

What clay and sand do to posts

The two counties split into two kinds of ground. Bonham, Savoy, Bells, Whitewright, and much of eastern Grayson sit on Blackland clay. The USDA's description of Houston Black clay records dry-season cracks up to 4 inches wide reaching a foot or more down, and that ground grips a post hard when wet and lets go when it shrinks. Posts set shallow in clay work loose over a few wet and dry cycles, and gate posts lean first because they carry the most load.

West of US 75, around Whitesboro, Collinsville, and Tioga, the Eastern Cross Timbers sandy loams auger easily but hold less. The Texas NRCS fence specification, the standard behind cost-shared conservation fences, sets anchor posts at least 3 feet deep and notes that sandy soils and consistently wet soils require additional depth. Where posts are set in concrete, it suggests belling out the bottom of the hole and sloping the top of the concrete so water runs away from the post.

Braces carry the fence

A wire fence is a tension structure, and the brace assemblies at its ends are its foundation. The Texas NRCS specification requires a brace assembly wherever a fence starts, stops, or turns 20 degrees or more. For barbed wire and woven wire it calls for:

  • A single H-brace where the run between anchors is under 660 feet.
  • A double H-brace, or a three-post assembly, where the run is longer than 660 feet.
  • In-line pull assemblies to divide any run longer than 1,320 feet.
  • A horizontal brace member set no lower than two-thirds of the top wire's height.
  • Welded joints on all-steel brace assemblies.

The same specification sets line posts no more than 20 feet apart without stays and 30 feet apart with them. Most working fences here run tighter than that ceiling, and our fence post spacing FAQ covers the common layouts. When a wire fence sags, look at the corners before the wire.

Match the wire to the animal

  • Cattle: barbed wire to ASTM A121, usually five strands, or high-tensile smooth wire for long runs.
  • Goats, sheep, and hogs: woven wire to ASTM A116, which the NRCS lists as best where tight control is necessary.
  • Horses: the NRCS specification advises avoiding barbed wire and steel T-posts where possible. Pipe, no-climb mesh, or pipe posts with mesh are the usual answers, and our comparison of pipe fencing and entry gates covers those choices.
  • Deer country: where the fence is under 48 inches, spacing the top two wires 10 inches apart reduces the chance of a deer catching a leg.
  • Electric: the NRCS specification sets minimum fence voltage by animal, 1,600 volts for cattle, 2,000 for sheep and hair goats, and 1,200 for hogs, horses, and meat goats.

Town by town

Fence work in this part of Texas follows the land. Around Bonham, where Bois d'Arc Lake has brought new homesites onto old farm ground, road frontage is where owners most often step up to pipe. Around Whitesboro, horse properties on sandy ground call for pipe or no-climb on posts set deeper than clay would need. In Tom Bean and Weston, much of the work is still cattle fence, where brace quality matters more than looks. On the slopes toward Texoma around Pottsboro, every bend of 20 degrees or more needs its own brace, so hilly lines carry more assemblies per mile.

Before the first post goes in

Survey the line, because a fence built a foot onto the neighbor's side is their fence. Call 811 before any auger turns. Clear the line of cedar and mesquite by the roots so regrowth does not push through the wire. Then set corners and gates first and run the wire between them. Because brace assemblies are the most labor-intensive part of a wire fence, a line with many corners and gates costs more per foot than a straight run of the same length. Our ranch fencing cost FAQ lays out the per-foot tiers for barbed, woven, and pipe fence, and the fencing and gates service prices your actual line, corners, and gates in a written scope. Call or text with a rough length and what the fence has to hold, and we can talk through the options.

Authoritative sources

  • TxDOT Access Management Manual

    Driveway approaches onto Texas state highways require a TxDOT access permit and must meet the manual's geometry, width, and drainage standards.

  • City of Sherman Development Services

    Building permits, contractor registration, and civil submittals in Sherman run through the city's Self Service Portal.

  • USDA Web Soil Survey

    County-level soil mapping for Grayson, Cooke, Fannin, Collin, Denton, Bryan, and Marshall counties, the starting point for pad and foundation planning.

Ready to get started?

Concrete driveways and slabs, site preparation, metal buildings, welding, and fencing across the US 75 corridor from McKinney to Durant since 2016, built by insured local contractors. Mon-Sat 8am-7pm CT.

Call (903) 308-5497Text us

Prefer to text? Open your texting app